ADI
HMC472ALP4ETR
Reference stock — availability confirmed before quotation.
- Reference total qty
- 42,865 pcs
- Factory lead time
- 10 weeks (factory lead time, reference)
Actual stock photos
Reference photos of material on hand; date codes shown for traceability only — not a quantity commitment.

2539+

—
Lot breakdown (Date Code + qty)
Batches marked for review are shown as supplied in the inventory feed — not reinterpreted on this page.
| Date Code / Batch | Qty (pcs) |
|---|---|
| 2535+ | 500 |
| 2535+ | 500 |
| 2539+ | 2,500 |
| 2536+ | 179 |
| 2535+ | 3,000 |
| 2539+ | 6,000 |
| 2535+ | 1,000 |
| 2539+ | 6,000 |
| 2539+ | 10,000 |
| 2539+ | 6,000 |
| 2534+ | 180 |
| 2539+ | 2,000 |
| 2536+ | 500 |
| 2540+ | 4,500 |
| 2052 | 6 |
Quality & Inspection — UUCCE
Every lot we sell passes the same five checks before it is quoted or shipped. Photos of the actual lot are available on request.
Full inspection process →On-site warehouse & handling
Carton & label close-ups
- 1
Source verification
Lots are sourced from franchised channels, OEM surplus and vetted distributors; origin is recorded per lot.
- 2
Visual inspection
Marking, pin condition, packaging and moisture-barrier integrity are inspected under magnification.
- 3
Label & date-code check
Reel and box labels are checked for consistency; the date code we publish is the date code on the label.
- 4
Photo record
Each stocked lot is photographed in our warehouse; the stock photos on this site are our own inventory.
- 5
ESD-safe packing & final check
Parts are packed to ESD and moisture standards and re-checked against the order before dispatch.
For qualifying orders, third-party laboratory testing can be arranged on request — ask us before you order.







